BST10 FAQs
Q: How can I integrate BST10 phases into Mosaic?
BST10 supports up to 9 levels of phases for a project.
Legacy BST10 Integrations
- Legacy BST10 integrations (connected prior to December 2023) on Mosaic only supports 2 levels of BST phases, following this project structure:
- Project (BST10 Project)
- Phase (BST10 Phase)
- Work Category (BST10 Subphase)
- Phase (BST10 Phase)
- Project (BST10 Project)
- If you are interested in turning on Subphases to integrate the lowest level of phases from BST10, please reach out to your Customer Success Manager.
- If you use up 9 levels of phases (BST10 Subphases) for project planning, you should consider using subphases.
New BST10 Integrations
- New BST10 integrations on Mosaic (connected after December 2023) are designed to automatically support up to 9 levels of BST phases, following this project structure:
- Project (BST10 Project)
- Phase (BST10 Phase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Subphase (BST10 Subphase)
- Phase (BST10 Phase)
- Project (BST10 Project)