BST10 FAQs

Q: How can I integrate BST10 phases into Mosaic?

BST10 supports up to 9 levels of phases for a project.

Legacy BST10 Integrations

  • Legacy BST10 integrations (connected prior to December 2023) on Mosaic only supports 2 levels of BST phases, following this project structure:
    • Project (BST10 Project)
      • Phase (BST10 Phase)
        • Work Category (BST10 Subphase)
  • If you are interested in turning on Subphases to integrate the lowest level of phases from BST10, please reach out to your Customer Success Manager.
  • If you use up 9 levels of phases (BST10 Subphases) for project planning, you should consider using subphases.

New BST10 Integrations

  • New BST10 integrations on Mosaic (connected after December 2023) are designed to automatically support up to 9 levels of BST phases, following this project structure:
    • Project (BST10 Project)
      • Phase (BST10 Phase)
        • Subphase (BST10 Subphase)
          • Subphase (BST10 Subphase)
            • Subphase (BST10 Subphase)
              • Subphase (BST10 Subphase)
                • Subphase (BST10 Subphase)
                  • Subphase (BST10 Subphase)
                    • Subphase (BST10 Subphase)
                      • Subphase (BST10 Subphase)